Doran Modern Elegant Travertine Tube Sconce

$179.00
Finish: Brass
Size: 6" D x 13" H
Shade: Travertine
Doran Modern Elegant Travertine Tube Sconce
Doran Modern Elegant Travertine Tube Sconce
$179.00

Doran Modern Elegant Travertine Tube Sconce

Enhance your space with the Doran modern travertine tube wall sconce. Natural travertine shade features distinctive porous texture, paired with brass, bronze or chrome hardware. It casts soft warm light, ideal for hallways, entryways, bedrooms and bathroom vanities.

Doran Modern Elegant Travertine Tube Sconce cj7.webp__PID:4125161b-ea74-4f46-a325-332989194788
Doran Modern Elegant Travertine Tube Sconce cj5.webp__PID:69b64125-161b-4a74-af46-632533298919
Doran Modern Elegant Travertine Tube Sconce cj1.webp__PID:b6367103-69b6-4125-961b-ea74ef466325

What Makes It Special

Natural Travertine Shade
Each tube‑shaped shade has unique porous stone texture, no two are identical.

Doran Modern Elegant Travertine Tube Sconce cj9.webp__PID:161bea74-ef46-4325-b329-89194788c910
Doran Modern Elegant Travertine Tube Sconce cj2.webp__PID:36710369-b641-4516-9bea-74ef46632533

Three Metal Finish Options
Select brass, bronze or chrome hardware to coordinate with home decor.

Warm Soft Ambient Light
Travertine diffuses light gently for cozy, glare‑free indoor illumination.

Doran Modern Elegant Travertine Tube Sconce cj4.webp__PID:0369b641-2516-4bea-b4ef-466325332989

Product Specifications

Doran Modern Elegant Travertine Tube Sconce cc1.webp__PID:0db63671-0369-4641-a516-1bea74ef4663

Attribute Detail
Material Metal, Travertine
Size 4" w x 6" d x 13" h
Back Plate 4" w x 6" d x 1" t
Wattage 40W
Number of Lights 2
Bulb Included Not
Power Source Hardwired
Hardwired Brass\Bronze\Nickel

Detail

Doran Modern Elegant Travertine Tube Sconce xj3.webp__PID:25332989-1947-48c9-901a-d7f6e6c08966
Doran Modern Elegant Travertine Tube Sconce xj1.webp__PID:46632533-2989-4947-88c9-101ad7f6e6c0
Doran Modern Elegant Travertine Tube Sconce xj2.webp__PID:63253329-8919-4788-8910-1ad7f6e6c089

Options

Doran Modern Elegant Travertine Tube Sconce bd3.webp__PID:290db636-7103-49b6-8125-161bea74ef46

Brass

Doran Modern Elegant Travertine Tube Sconce bd2.webp__PID:88290db6-3671-4369-b641-25161bea74ef

Bronze

Doran Modern Elegant Travertine Tube Sconce bd1.webp__PID:5388290d-b636-4103-a9b6-4125161bea74

Nickel

Thanks for subscribing!
This email has been registered!
Sorry! Products are not enough.
Recipient email can't be blank.
Send on must be within 90 days from now
Thank you for registering! We will notify you by email when it is back in stock.